Tekmar essay e 005

If any of the contents listed are missing or damaged, please refer to the Limited Warranty and Product Return Procedure on the back of this brochure and contact your wholesaler or tekmar sales agent for assistance.

Caution Improper installation and operation of this control could result in damage to the equipment and possibly even personal injury.

Installation, Step four, Step one – tekmar 650 Snow Melting Control User Manual

If the control is to be mounted on an electrical box, the wiring can be roughed-in at the electrical box prior to installation of the control see Brochure D Standard 18 AWG solid wire is recommended for all low voltage wiring to this control. The sensor should be placed approximately 3 feet 1m from the edge of the slab.

It is your responsibility to ensure that this control is safely installed according to all applicable codes and standards. Do not connect the wires to the terminals yet.

Tekmar Essay E 005 – 678442

Testing and connecting the wiring Caution These tests are to be performed using standard testing practices and procedures and should only be carried out by properly trained and experienced persons.

Turn on the 24 V ac power supply and, using a voltmeter, you should measure between 20 and 28 volts between the power and common terminals. Test the sensors according to the instructions printed in the enclosed Data Brochure D Step Three Rough-in wiring All electrical wiring terminates in the two wiring chambers at the bottom front of the control.

A Class 2 transformer must be used. Step One Getting ready Check the contents of this package. A good quality electrical test meter, capable of reading from at least 0 — Volts, and at least 0 — 2, Ohms, is essential to properly test this control.

Do not connect either of the transformer secondary wires to ground. This electronic control is not intended for use as a primary limit control. At no time should voltages in excess of 28 V be measured at any of the wires connected to the control. Run the wiring back to the control but do not connect the wires to the terminals yet.

Carefully read the Sequence of Operation section in this brochure to ensure that you have chosen the proper control and understand its functions within the operational requirements of your system.Επιστημονική Ομάδα καθηγητών Καραγιάννη - Κέντρο Φορολογικών και Λογιστικών Εφαρμογών στην Πράξη.

This essay provides a short description of these func- tions in order to assist in the selection of the appropriate control solution. More comfort is achieved by. - Application Brochure Boiler Control A 10/03 Features of the Boiler Control Please refer to Essay E Control Functions and Benefits for a detailed description of these features.

Application The tekmar Boiler Control can control the supply water temperature from up to 9 on / off stages based on outdoor temperature, control. • Essay EEssay E Note: Carefully read the Sequence of Operation section in this brochure to ensure that you have chosen the proper control and understand its functions within the operational requirements of your system.

The 0 Ω Converter is designed to convert a 4 - 20 mA modulating signal from a control to a 0 Ω resistance signal.

It can be used in applications where a modulating boiler control is used to operate a boiler that requires a 0 Ω signal. - Application Brochure Boiler Control A 03/09 Features of the Boiler Control Please refer to Essay E Control Functions and Benefits for a detailed description of these features.

Application The tekmar Boiler Control can control the supply water temperature from a single modulating boiler or up to 2 on / off stages based on.

Download
Tekmar essay e 005
Rated 3/5 based on 47 review